الصفحات

2012-12-27

delegation Iraqi



Detailed report on the visit by a delegation Iraqi Southern Oil Company to China Great Wall company



2012-12-23





report on the use electronic pressure measurement device




Prepare an extensive and comprehensive report on the use electronic pressure measurement device and method of his inauguration and programming work in the oil sites and how to extract information from him in the form of curves and determine the stability of oil well


calculate productivity




Design a program using Microsoft Excel to calculate productivity for an hour or two and find the total energy per day barrels \ day


annual report





Prepare an annual report of all the wells containing pressure on the well head and choking valve opening and taking superficial samples of crude oil


report



Prepare a detailed report on the status of the well




2012-12-22

greatwall company








invitation greatwall drilling company



To invite the Chinese company greatwall drilling company for the potential of the company and the latest on their finding of techniques and benefit from their experience


activated dead wells




Work to activated dead wells (when you get a a large decrease in the flow and pressure as well as when acidification wells to get rid of the acid within the well) and the process of pipeline flow to the burn pit.

Pressure gauge closed wells




Pressure gauge closed wells and make sure valves during the examination of the pressure

measuring productivity



Work on segregation surveillance Living situation in insulating oil stations and gas and maintain the stability of the station during the process of measuring productivity station

Certificate of Merit




certificate of accomplishment presented to aqeel saeed in recognition of successful completion of mastering drilling contract


Field teams





Field teams


S.A.S










laboratory devices



Work in the laboratory devices to calibrate devices and Replacement batteries






kuster k10




Work on linking device kuster k 10 on the well programmed to get the desired results of the well as shown below







kuster k10




Work on linking surface pressure measuring device to the wellhead to determine pressure and surface temperature of the well

Pressure monitoring wells





Pressure monitoring wells (pressure flow upper and lower flow pressure) and choking valve openings and taking superficial samples of crude oil


بحث هذا الموقع الإلكتروني